1. <thead id="haxvp"><small id="haxvp"></small></thead>
    <span id="haxvp"></span>

    <rt id="haxvp"><optgroup id="haxvp"><strike id="haxvp"></strike></optgroup></rt>

    <span id="haxvp"><optgroup id="haxvp"><center id="haxvp"></center></optgroup></span>

    News

    How to Clean Techcon spray Valve TS5540

    Release Date:2017-08-08
    How to clean Techcon spray valve TS5540? How to clean Techcon dispensing valve? Techcon China authorized agent Shenzhen Yapude Technology Co., Ltd. shares the following:
    6.JPG
    1. Release the liquid pressure from the liquid storage container.
    2. Remove the liquid pipeline and valve air hose from the valve.
    3. Rotate the stroke control adjustment knob (19) counterclockwise beyond the "line mark" and remove it. The compression spring will push the knob out.
    4. Remove the compression spring (1) and its end washers (18).
    5. Use an open-end wrench to remove the locking cap (8), and then pull out the air cap (11) from the liquid cover (7).
    6. Use an open-end wrench to remove the nozzle (9) and gasket (13); If the O-ring is damaged, please replace it.
    7. Hold the liquid shield (7) and rotate the cylinder/needle assembly (2) counterclockwise. After fully unscrewing, pull these two valve components straight apart to separate them.
    8. Dip the soft brush in isopropanol and clean the liquid cover (7), needle/piston assembly (17), and nozzle (9).
    If there is a leakage in the valve, please use the large head screw (TSD1113-28) to remove the base (10) and replace it with a new base; Please refer to the instructions in section 7.4 "Replacing the Base".
    10. Reinstall the nozzle (9), gasket (13), air cap (11), and locking cap (8) into the liquid shield (7).
    11. Lubricate the O-ring (6) with grease, and then reinstall the cylinder/needle assembly (2) into the liquid shield (7).
    12. First, place one McLaren washer on the needle/piston assembly (17), and then place the other McLaren washer and compression spring into the stroke control adjustment knob (18) one after another, in order to install the compression spring (1).
    13. Rotate the stroke control adjustment knob (19) clockwise completely into the knob base, then counterclockwise to the desired position, but do not exceed the "line mark" on the base.

    More information about Techcon can be found at Yapude Technology! Looking forward to your attention!
    展開
    啦啦啦资源在线观看视频| 99re国产精品| 亚洲一区在线视频观看| 久99久热只有精品国产男同| av在线播放日韩亚洲欧| 野花直播免费观看日本更新最新| 99久久精品费精品国产| 97se亚洲综合在线| JIZZJIZZ亚洲日本少妇| 特级毛片a级毛片免费播放| 久久香蕉国产线看观看亚洲片| 欧美日韩国产在线观看一区二区三区| 人妻老妇乱子伦精品无码专区 | 色婷婷综合在线| 国产青草亚洲香蕉精品久久| 久久精品国产精品亚洲色婷婷| 欧美激情一区二区三区在线| 国产一级一级片| 9i9精品国产免费久久| 特黄黄三级视频在线观看| 国产精品99re| 视频在线一区二区| 亚洲欧美日韩精品久久亚洲区色播 | 美女黄网站人色视频免费国产| 亚洲精品电影在线| 日美女大长腿b| 一边摸下面一别吃奶| 国产熟睡乱子伦视频观看软件| 色妞色视频一区二区三区四区| 日本一区中文字幕日本一二三区视频| aaa日本高清在线播放免费观看 | 2018天天干天天射| 亚洲中文字幕久久无码 | china同性基友gay勾外卖| 99久久综合久中文字幕| 毛片免费在线播放| 触手强制h受孕本子里番| 性做久久久久久久久| 精品少妇一区二区三区视频| 亚洲AV无码潮喷在线观看| 日本XXXX裸体XXXX|